Surfaces that go in fast and come out clean
Show grounds, championship venues, and temporary stabling builds — installed to a deadline, used under scrutiny, and often removed afterwards.
Event work is a different problem from a barn. The install window is short, the surface is judged by people who are paid to notice, and much of it has to be lifted and stored afterwards. SoftStep interlocks rather than bonds, which is why it ends up on this kind of project.
How an event project runs
Areas, square footage, base condition, and the access window agreed against your build programme.
Delivery, storage on site, and labour planned around the rest of the venue build.
Laid to the agreed programme, with edge and transition detail where the public will see it.
Removed after the event, palletised, and stored for reuse where the arrangement calls for it.
Where this has been done
SoftStep flooring supported the Vancouver Olympics, and SoftStall systems have been installed in facilities used at the World Equestrian Games. Both were projects where the surface had to be right on a fixed date and hold up under continuous scrutiny.
Vancouver Olympics — SoftStep flooring
World Equestrian Games facilities — SoftStall systems
Temporary stabling and show ground installations
Permanent venue stabling
Project names, dates, and permission to reference them by name require confirmation before publication.

Temporary versus permanent
Interlocking pavers can be lifted, palletised, and reinstalled, which makes them suitable for annual events and touring builds. Permanent venue stabling is treated like any facility project — a single specification, phased if the calendar requires it.
Interlocking pavers lift and reinstall for reuse
Permanent stabling specified as a facility project
Mixed builds — permanent core, temporary overflow
Storage and refurbishment between events
Commercial and programme terms
Large projects are quoted as projects, with labour, logistics, and phasing priced in. Rental or reuse arrangements for temporary installations are discussed case by case.
Venue and project questions
Interlocking pavers go down quickly once the base is ready. The programme is usually set by base preparation, not by us.
Yes — pavers lift, palletise, and reinstall. Storage and refurbishment between events are part of the conversation.
Yes. Stabling, aisles, and visitor-facing pathways are commonly specified together on venue projects.
Yes. Venue projects normally run alongside a main contractor and we coordinate with their programme.
Project documentation
Planning a venue or event build?
Give us the areas, the dates, and the access window and we will come back with a project proposal.
