Specification detail your package can carry
Substrate, drainage, loading, cleaning, and maintenance detail for equine flooring — plus a straight answer about which figures are documented and which are not.
Specifying equine flooring means answering questions that most flooring datasheets do not address: what happens under a 500kg animal standing for eighteen hours, and what the cleaning regime does to the surface over a decade. We would rather give you a technical contact than a brochure.
How we work with design teams
A conversation at concept or schematic stage about which areas need which system, and what each demands of the substrate.
Material and performance detail supplied for your specification sections, with any unconfirmed figures identified as such.
We respond to submittal and RFI queries directly rather than through a sales queue.
Installation coordinated with the contractor and inspected before handover.
Substrate and drainage requirements
Sealed stall flooring requires a sound, level base with controlled drainage. SoftStep pavers require a level, well-drained prepared base with a defined tolerance. Both requirements need to be reflected in the groundworks package rather than resolved on site.
Base material, level, and finish requirements
Slope and drainage design in wash and stall areas
Threshold and doorway detail
Base tolerance for paver installations — figure TBD
Published substrate tolerance figures and the formal base specification require confirmation.
Performance data: what exists and what does not
We publish performance figures only alongside the test method that produced them. At present, impact force reduction for wall padding, wet-slip performance, and loading figures for vehicle traffic are all pending confirmation. If your specification requires a figure we cannot yet document, tell us early — it is better addressed at design stage than at submittal.
Material composition and thickness — TBD
Impact force reduction (SoftWall) — TBD
Wet slip resistance — TBD
Vehicle and equipment loading — TBD
Test reports, methods, and certification documents must be supplied and reviewed before any figure is published or issued in a submittal.
Cleaning and maintenance specification
For clinical and public-facing projects the cleaning regime often drives the specification. The surfaces are non-absorptive and sealed, so cleaning agents act on the surface — but agent compatibility should be confirmed and written into the O&M documentation rather than assumed.
Design team questions
We supply the technical content; the section is written to your office standard. Tell us the format you work in.
Any certifications will be stated with their scope once confirmed. We do not claim certification in the interim.
A named technical contact, not a general sales inbox. Commercial enquiries are routed accordingly.
Yes — 23 countries to date, often with local partners on installation. Discuss your project location with us early.
Technical documents
Specifying on a live project?
Tell us what your package requires and we will confirm what we can substantiate today.
